Construction contract awards reach 7.1bn in February, their highest level in seven months
- Construction spending at highest levels in months
- Infrastructure is a star performer, reaching highest spending level in over four years
- Commercial has a stellar month as mega projects are confirmed
- Businesses remain coy on new planning applications as they await better economic news
February saw construction contract awards reaching £7.1bn, their highest level in seven months, according to Barbour ABI’s latest data. An 11% increase in contract awards in February appeared to confirm the increased spending trend reported by Barbour in January, as industry spenders continued to flex their muscles.
Infrastructure was the star performer with spending increasing by 108% on January. Contracts for two road tunnels under the Thames for the Lower Thames Crossing in Kent were agreed with a value of £1.3bn.
Better prospects are also in store for the commercial sector as the significant headwinds faced since the onset of the global pandemic begin to ease.
A 152% increase in spending included the £330m refurbishment of Citi Group’s iconic 42-storey tower at Canary Wharf finally got into contract in February, adding to the already sizeable pipeline of extensive refurbishments in the commercial sector.
Redevelopment of ITV’s former recording studio on London’s Southbank gained planning consent after a lengthy delay and Stanhope submitted revised plans for what will become the City of London’s tallest tower – 1 Undershaft – in January.
Barbour ABI consultant economist, Kelly Forrest commented:
“Generally, commercial project viability remains tight, but progress on these mega projects is nevertheless great news for the industry. Along with infrastructure, these sectors are providing an antidote to continued malaise in residential construction, which is still being weighed on by higher mortgage rates and weak consumer confidence.”
First look at 2024 planning applications
March provided a first look at planning applications in 2024. At £7.1bn in January, applications were 22% lower than a year ago with residential, Industrial and infrastructure all seeing sharp drop offs.
Forrest continued: “Notably, we are seeing clear divergence emerging between spending and new planning applications. Decision makers are eager to get existing and approved projects off the ground, but they don’t yet have the confidence to look ahead to new work. Viability is a big factor constraining developers’ appetite to present schemes to planners, but this should improve when financing costs start to reduce.”
--Barbour ABI 12:28, 18 Mar 2024 (BST)
[edit] Related articles on Designing Buildings
- April turn for the worse, for construction, as market seesawing continues
- Best value procurement.
- Bid evaluation.
- Contract award.
- Contracts under seal v under hand.
- Construction contract.
- Construction industry revs engines in January.
- Contract negotiation.
- Education and Health applications shine in subdued construction October market.
- Infrastructure tumbles, adding to construction industry woes.
- Letter of award.
- Most Economically Advantageous Tender (MEAT).
- New energy rules, a threat to towns and cities across UK
- Procurement route.
- Subdued planning environment figures provide scant hope for house-building targets
- Tender processes.
- UK Construction saw an £11.1bn fall in spending in 2023
- New energy rules, a threat to towns and cities across UK
- Infrastructure tumbles, adding to construction industry woes
- Construction industry revs engines in January
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.